November starts with Rebuilding the dash and brake pedal.
Front Dash cleaned up very nicely. One of the lenses was replaced from Hughs stock, but everything was cleaned, restored and installed from what came out of the car originally
This is pic from fresh rescue from Arizona desert for comparison to final product all cleaned up above.
Not much difference to see, but installed new front rotors and dust cap covers on the hubs. Hung all of the LED lights, and then proceeded to clean out the garage. Took out Big Red and pressure washed her to get the last of the Arizona Sand out.
Refurbished Ready to dye. Going into storage for now and will be dyed prior to installation
Found old ignition switch and chrome washer for door latch. NOS found in Hugh's vast inventory.
Delamination during repair
After repair
Hood repair phase 1
11/16/22. Time for Swap, Body moved outside on body dolly and frame moved inside. Weather forecast is rain and 40's for the next 1-2 weeks.
Frame moved inside
Last caliper removed, rest of rear end removed. Onto front suspension next and then finish cleaning and encapsulating frame, then paint frame
Combination of Hugh and Jonathan using Bauer Stripping tool and die grinder to remove surface rust. Then wipe down with degreaser and claening fluids
Frame has zero problems. Great to be at this point with no major rust issues
Frame painted with Corroseal to encapsulate any rust.First White, then Blue then final ends with matte black. then paint with VHT for final black satin finish
Hughs68Corvette
Copyright © 2025 Hughs68Corvette - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.